2.5inch Gold Dredge Mini Washing Machine
The 2.5 inch dredge is equipment for economy and portability. This series of gold dredge is with a smaller volume. The innovative system with unmatched performance is specifically designed for operating in extremely remote and challenging locations. It can be easily transported and quickly assembled ,can be equipped with a variety of engines, pumps and compressors , provides different power options to meet individual needs.
This series of gold dredge is with a more widely new high performance chute recovery system,and equipped with high-efficiency rubber mat that is designed for superior gold recovery.
Equipped with a large diving suction nozzle (SN) and deep water suction nozzle (PJ),the PE horn mouth has greater suction and unclogging function.
The original T80 air compressor can supply air for divers. The dredge is equipped with light PE floating and two- frame component to provide a compact assemble,and the smaller and lighter design is adapt to the small compact truck or SUV trunk.
RL-2604HCPJ Specification |
NO |
Title |
Specification |
Remark |
1 |
Pump/Power |
DW160/MITSUBISHI 4HP |
|
2 |
Air Compressor |
T-80 |
The machine with T80 air compressor contains: Air bag x 1 pc, T80 x 1 pc, diving air pipe x10m, Diving respirator x 1 pc. |
3 |
Sluice Size(cm) |
122*35 |
|
4 |
Max Dredging Depth |
6m |
|
5 |
Capacity(m³) |
2m³/h |
|
6 |
Fuel Consumption (L) |
1.3L/H |
Gasoline |
7 |
Suction Hose/Length |
2.5'' * 6m |
|
8 |
Pontoon (cm) |
167*110*33 |
|
9 |
Net weight |
79kg |
|
10 |
Packed Weight |
154kg |
|
11 |
Packing Size |
1.85m*0.7m*0.6m |
0.78m³ |
Features:
1.We use Mitsubishi engines, which are recognized as the best quality engines in the world. Fuel-efficient, durable, the engine technology is mature and stable, and the failure rate is very low.
2.According to the characteristics of gold, we have produced special-shaped rubber gold-selecting mats, which can form different vortices in the water stream and grab gold of different sizes, which is 30% more efficient than traditional rubber gold-selecting mats.
★ 1 Hour to Qingdao Port ★ 2 Production Bases ★ 10 + Years Experience Professional Manufacturer
★ 20+ International Approvals ★ 30+ People Professional R&D Dept. ★ 35+ Family's Factories
★ 60+ Exporting Countries ★ 100+ Cooperative Factories ★ 200+ Workers and Sales Team
★ 300+ Professional Projects ★ 500+ Active Customers ★ Direct Factory Price
FAQ
1) What's your main gold mining products?
Our gold mining products include Gold Dredge, Sluice Box, Gold Trommel Screen, Helic Trommel
Machinery, etc.
2) How will you guarantee the quality?
For all our machinery, 1 year guarantee for the main accessories.
3) How long is time of production?
Smaller type normally around 7 days, larger type 15-30 days. We will guarantee the quality first, and
try best speed.