• Maximize Production of Additional Sand Pump in a Long Discharge Pipeline Pumping Boosterstation
  • Maximize Production of Additional Sand Pump in a Long Discharge Pipeline Pumping Boosterstation
  • Maximize Production of Additional Sand Pump in a Long Discharge Pipeline Pumping Boosterstation
  • Maximize Production of Additional Sand Pump in a Long Discharge Pipeline Pumping Boosterstation
  • Maximize Production of Additional Sand Pump in a Long Discharge Pipeline Pumping Boosterstation

Maximize Production of Additional Sand Pump in a Long Discharge Pipeline Pumping Boosterstation

Type: Dredger
Capacity: 1000-6000cbm
Transport Package: Container
Specification: container
Trademark: Relong
Origin: China
Diamond Member Since 2021

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory, Trading Company, Group Corporation

Product Description

Land-based or floating

Relong Booster Pump Stations additional power for dredgers


1. Production Description:

When the discharge length needs to be increased, a stand-alone booster pump/booster station can be added to the discharge line. This will ensure productivity over the total required discharge length. RELONG Booster pumps/ booster stations can be used when pumping beyond the maximum discharge distance of the dredging pump is required. With multiple booster pumps/booster stations in the discharge pipeline, the material can be dredged miles away!
Booster pumps/booster stations can be used with trailing suction hopper dredgers and cutter suction dredgers. Sometimes multiple pumps are used along the discharge pipeline, providing additional power to the discharge pumping system of these dredgers.
 
Maximize Production of Additional Sand Pump in a Long Discharge Pipeline Pumping Boosterstation
 
 

2Features: 
1. High-efficiency dredge pump
2. Process monitoring and automation
3. Remote control from dredger possible
4. From standard to fully custom-built designs
5. Interfaces with other equipment
6. Balanced and rigid design
7. Identical spare parts for dredger and booster



3. Technical Parameters:
 The parameters are just for reference.We will provide the machine according to your requirement.
 
 
4. Application :
Boosters(for dredging) may be based on land or on a floating platform and may be almost as powerful as the dredger they are supplementing. Occasionally, they are placed on the deck of a vessel but usually they are attached to the floating pipeline along its way from ship to shore.
Maximize Production of Additional Sand Pump in a Long Discharge Pipeline Pumping Boosterstation
5. Quality Control

Maximize Production of Additional Sand Pump in a Long Discharge Pipeline Pumping Boosterstation
 
 
 
6..Company profile :                                                    

Relong Environment Technology Co., Ltd. is located in Qingdao City, Shandong Province. It is a company dedicated to intelligent robots, ship design, water transportation equipment, marine water quality, and ecological environment testing, salvage services; industrial automatic control system devices, radar and supporting equipment, communication equipment, which is a high-tech enterprise integrating sales and artificial intelligence software development, including consulting, design, production, installation, and operation management.

Relong has built cooperation with colleges and scientific research institutes like  The Ocean University of China, Jiangsu Ship Design Institute, and Shandong University. And Relong has numerous research and development platforms including Provincial-Level Industrial Design Center, Provincial-Level "Enterprise & Technology" Development Center, Municipal Engineering Research Center, And Engineering Laboratory. Relong has a number of independent intellectual property rights, including 33 National Patents, 2 Scientific And Technological Achievements that have reached the international grade and 1 reached China advanced level. Relong has won several first prizes in Provincial Technical Innovation Outstanding Achievements And Technology Innovation Outstanding New Product, Technology Progress Award, etc.
 

Maximize Production of Additional Sand Pump in a Long Discharge Pipeline Pumping Boosterstation

9. Certificate:
Maximize Production of Additional Sand Pump in a Long Discharge Pipeline Pumping Boosterstation
 
 
7. Related products:
Maximize Production of Additional Sand Pump in a Long Discharge Pipeline Pumping Boosterstation
 
 
8. FAQ:
How long is the delivery time of your equipment?
--Within 15-20 days after receiving the deposit.
2. How to install the machine?
--If need the seller's installation help, the seller will send one (1) technologist to Your workplace to conduct installation and
train 3-5 workers to operate the machine, the buyer shall arrange at least 3-5 workers to work with the engineers.
3. How long is the equipment warranty period?
-- We provide a 12-months warranty for the quality of the diesel engine/generator, motor water pump (impeller is 6months), storage battery, but not responsible for rust.

 
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now